MCA-Belize intends to develop, procure, install, test, commission, and place into commercial operation a submarine transmission cable system with integrated fiber optic under an Engineering, Procurement, Construction, and Installation (EPCI) Contract (FIDIC Silver Book).
The Project is a strategic infrastructure investment designed to increase transmission capacity between the Belize mainland and Ambergris Caye to reliably and economically meet demand growth on Ambergris Caye and bring down the overall cost of electricity.
The MCA-Belize seeks to appoint an experienced Employer’s Representative to act on its behalf to provide independent technical, commercial, contractual, environmental, and project management services throughout design, manufacturing, installation, testing, commissioning, and warranty phases of the EPCI Contract.
A complete set of bidding documents may be obtained by interested eligible offerors upon
registration through the following Link
A virtual Pre-Offer Conference will be held on 25 September 2026 at 13:30 hours (local time in Belize) through the Microsoft Teams platform:
Link to the conference: Conference Link
Offers must be submitted through the File Request Link (FRL) provided below no later than 14:00 hours (Local time in Belize) on 26 October 2026. Only electronic submission will be permitted. Late offers will be rejected. File Request Link
Technical offers will be publicly opened virtually in the presence of the offerors’ designated representatives and any other interested parties on 26 October 2026 at 14:30 hours (local time in Belize) via the following link: Link
Contact Information For Reference:
Millennium Challenge Account – Belize
5th Floor, Atlantic Insurance Tower
2 ½ Miles Philip Goldson Highway
Belize City, Belize
Email: pabelize@charleskendall.com